Sunday, January 18, 2009

To show the workers we appreciate their hard work, we went over to the building site and we asked the Hostel kids to hand out drinks to the workers. The workers saw they are valued and for whom they are actualy making this building and the kids realized that miracles most of the time don't grow overnight.

Building the walls on ground floor

while others still work on the roof they started to build the walls on the ground floor. Here you see them working on the senior unit.

On the left you see that ladies do perfectly fine in the construction world. They are half the size of me, but work very hard.

safety?!


Safety is very subjective. Those guys walk over the roof on slippers and it looks like their walking through the mall. Not my kind of job.

reaching the highest point

From the front and the side you see how they weld the roof structure


tough girls


Don't tell Ava she is too small to go up the ladder.

1st floor done!

First floor is done. Pillars for the roof structure are up and Ava is trying our her imaginery bath tub.




lunch time


This lady comes every day with her truck full of bags with food. Everybody stops working and goes out to buy his of her food.

It goes so quick; here the panels for the 1st floor go on




The Office


The foreman and building supervisor have their own office, but now they are complaining over the view.




first floor


After the pillars were done, they continued with building a supportive structure for the 1st floor.

overview

we are often making overview pictures from the same spot, so over time you will get a good impression how things have developed.

The girls are checking the work


Marielle, Suvi and Ava are checking whether things are going all right. Ava is covering her ears because of all the noice.